• Desmantling bottom support "U" of 6"x2" (base)
• Belt of 4"x 2" (2 pieces)
• Supplying and assembly of them.
• Two caps made of sheet of 3/8"
• Seal of neoprene
• Two handles
• Two hinges
• Six safety screws
• Sandblast to white metal by mechanics way.
• Applying anticorrosive primer painting for offshore
• Green color for offshore.